Track 3 beginnings. Tracks 1 and 2 sub-roadbed finished.
Track 3 beginnings. Tracks 1 and 2 sub-roadbed finished.
Track on the public loop is 3/4 finished. Light reflections off the glass will mean lots of hand prints as visitors try to shade the glare.
Track on the public loop is 3/4 finished. Light reflections off the glass will mean lots of hand prints as visitors try to shade the glare.
Track has been laid on the outer loop from the shear wall around to the Thomas area.
Track has been laid on the outer loop from the shear wall around to the Thomas area.
Great progress today .... again!
Great progress today .... again!
Glass is being installed ..... there goes our outside access!
Glass is being installed ..... there goes our outside access!
Looking toward the Thomas area. The track ends indicate where the lift bridge will be installed.
Looking toward the Thomas area. The track ends indicate where the lift bridge will be installed.